
Another dam in KPK has been connected to the national grid station.
The dam is going to produce 36.6 Megawatts of electricity and generate some 1.2 Billion rupees annually in terms of revenue.
The project is located in district Swat.
Daral Khwar Hydropower station (36.6 MW) is successfully connected to Nation Grid on 15 September 2018. The project is…
Posted by Pakistan Tehreek-e-Insaf on Sunday, 16 September 2018
from Trends Of Pakistan https://ift.tt/2Dc9qFk
via IFTTT

No comments:
Post a Comment